CoE Infrastructure Development
- Four labs has been set up in the centre.
- Following equipment have been received at centre as part of the CoE facility for testing and characterization of refractories materials in the various labs:
- High Temperature furnace having temperature 1400, 1600 deg C(4 nos)
- Spalling resistance furnace @1400 deg C
- Static corrosion facilities
- Universal testing machine having capacity 50, 500 and 2000KN (3nos)
- Roll Crusher
- Jaw crusher
- Core drilling Machine
- Diamond cutter
- Castable vibrating Table
- PCE/RUL
- UV Spectroscopy
- Flame photometer
- This facility will intensify the capacity building and research collaboration with academic/industrial organizations
- The facility will help in revenue generation and thereby make the CoE sustainable